UK Local Government / Civic Office

Local Government Civic Office: HVAC optimisation alongside wider decarbonisation

EcoAI optimisation was integrated with the existing Building Management System at an 8,500 m² UK civic office, improving HVAC operation while working alongside a wider building decarbonisation programme.

  • 8,500 m² civic office
  • Existing BMS retained
  • Wider decarbonisation programme
  • First-year performance analysis

Key results

First-year performance against the adjusted expected profile

17.9%electricity below expected consumption
222,278 kWhelectricity below the expected first-year profile
8.0%total energy below expected consumption
137,701 kWhnet energy reduction across electricity and gas
£37,474.87calculated first-year net saving

Executive summary

Operational optimisation alongside estate decarbonisation

A UK local authority was implementing a wider building decarbonisation programme across its estate, including heat pumps, solar generation, battery storage and Building Management System improvements.

At an 8,500 m² civic office, EcoAI's optimisation technology was integrated with the existing BMS to improve HVAC operation while retaining the building's installed controls infrastructure.

The project demonstrates how active HVAC/BMS optimisation can work alongside wider decarbonisation investment without requiring the existing controls platform to be replaced.

Assessment approach

Why the expected post-project profile mattered

The challenge was not simply to compare one year with another. The wider carbon-reduction measures were expected to materially change the building's energy profile, with electricity consumption forecast to increase by 35% and gas consumption forecast to reduce by 70%.

Performance was therefore assessed against the expected post-project/post-decarbonisation profile. Across the first 12 months, electricity consumption was 222,278 kWh below expected. Gas consumption was 84,577 kWh above the expected level, giving a net energy reduction of 137,701 kWh.

At the energy rates used in the first-year analysis, this equated to a calculated net saving of £37,474.87.

First-year results

Expected vs actual post-integration performance

The wider project anticipated a 35% increase in electricity use and a 70% reduction in gas use as other carbon-reduction measures were implemented, so a simple historic year-on-year comparison would have been potentially misleading.

Measure Reference year Expected Actual/post integration Position
Electricity 920,981 kWh 1,243,324 kWh 1,021,046 kWh 222,278 kWh reduction, 17.9% below expected
Gas / heating 1,564,930 kWh 469,479 kWh 554,056 kWh +84,577 kWh variance against expected
Net energy position Reduction against expected consumption 137,701 kWh
Electricity cost Not applicable £246,802.80 £202,680.07 £44,122.73 saving
Gas / heating cost Not applicable £36,901.65 £43,549.51 +£6,647.86 variance
Calculated net saving Expected energy costs compared with actual energy costs used in the first-year analysis £37,474.87

Demand shift

Optimisation measured against the future operating profile

Heat electrification and other carbon-reduction projects can shift demand between fuels. Optimisation performance therefore needs to be considered against the expected future operating profile rather than only a historic baseline.

EcoAI's contribution was evaluated against the adjusted expected profile to separate the optimisation effect from the wider programme as far as the available data allowed.

What the project shows

Three practical lessons for decarbonising estates

Existing BMS

Optimisation can be introduced through existing controls infrastructure rather than requiring wholesale replacement.

Wider programme

Operational optimisation can complement heat pumps, on-site generation, storage and other decarbonisation measures.

Measured value

The business case can be evaluated against an adjusted expected profile when other projects are changing the building's energy mix.

Qualification

First-year project analysis

The figures reproduce the first-year project analysis. The calculated £37.5k saving is the difference between the expected and actual energy costs used in that analysis. The 137,701 kWh net energy reduction is rounded to 138 MWh in headline communications.